Reduction of waiting time of passengers to receive their baggage at Imam Khomeini airport

To reduce the stagnation of passengers at Terminal No. 1 of Imam Khomeini International Airport, the operation of changing the conveyor belt of the entrance hall of the terminal to a 120m conveyor belt was performed. This new conveyor belt was designed and built by domestic experts of Baal Industries Company. Due to the length of these conveyor belts, the distribution of passengers’ load on them is better done, and the passenger’s waiting time to receive the load will be reduced