Design, construction, installation and installation of various airport equipment in Shiraz, Rasht, Hamedan, Kermanshah, Imam Khomeini, Gachsaran, Mehr Abad, Tabriz, Lamerd, Kish, Bushehr 2006 – 1397

Design, construction, installation and commissioning of various airport equipment:

1- Design, construction and commissioning of 32 meters belt conveyor belt – entrance terminal of Hajjaj Airport Shiraz-1399

1- Design, construction and implementation of a 28-meter air-conditioner conveyor belt – Imam Khomeini International Airport (RA) -1390

2- Designing, manufacturing and commissioning of 70 meters of the linear conveyor belt of the customs office along with PILOT flotation intelligence for a route – Imam Khomeini International Airport (RA) -1392

3- Automation of the outputs of Terminal 1 of Mehrabad Airport by constructing 4 linear conveyor belt systems with a length of 30 m and a BC conveyor belt with a 90 ° angle; – Mehrabad International Airport International Office

4- Two-stage loading of X-ray of terminal 4 – General Office of the International Airport of Mehrabad – 1394

5- 31 Angled Line Conveyor Belt – Imam Khomeini International Airport (RA) – 1394

6. Design, construction and installation of two carousels, two linear devices and one flying device-airport -1397

7- Designing, manufacturing and installing 3 BC machines, 5 linear conveyor machines, 4 weighing scales and 1 carocel equipment, Shahid Madani airport, Tabriz-1397.

8. Reconstruction of 3 scales, 2 scales, 1 linear conveyor, 4 screwdrivers, Yazd -1397

9 – Construction and installation of 4 weight scales, 4 transmitting devices, 3 linear linear units, 2 BC devices, 1 slanting machine

10. Construction and installation of a screw conveyor and linear conveyor-Hamadan -1396

11- Launch of 2 linear conveyer units, 4 scales, Kermanshah-

12-Making and Installing 1 Pylta-Gachsaran-

13. Construction and installation – Lamerd-