Installation of PCA and GPU of Aircraft

Bandar Abbas airport, Mehrabad Airport and Salam Terminal of Imam Khomeini Airport, Iran.

The Baal Industries Co. installed and operated the PCA (air-conditioning system) and GPU (400 Hz Power Supply) to provide pleasant air inside the aircraft and to supply power for the aircraft at the time of the park and boarding on the PBBs of Bandar Abbas airport, Mehrabad Airport and Salam Terminal of Imam Khomeini Airport.